


PROJECT:
NOVASPECT
LOCATION:
Schaumburg, IL
PROJECT COST:
$2,218,000
PROJECT DETAILS:
43,000 SF Demolition and Construction of Corporate Offices, Training and Manufacturing Facility. Custom Design, and Finishes. Energy Efficient Lighting Up-Grades Energy Efficient HVAC Package, Loading Dock and HD Ramp Installation, Exterior Landscaping and Lighting.



PROJECT:
Philips Lighting
LOCATION:
Rosemont, IL
PROJECT COST:
$1,198,000
PROJECT DETAILS:
75,000 SF Corporate Offices. Complete Renovation of Multi Floor Corporate Offices Including Reception Area Elevator Lobbies and Board Rooms. This Project was Executed during normal business hours and without Interruption to Philips business operations.



PROJECT:
SALON 530
LOCATION:
Barrington, IL
PROJECT COST:
$280,000
PROJECT DETAILS:
3,500 SF Design Build 15 Station Salon & Spa / High Level Custom Design & Finish.



PROJECT:
VANGUARD LOGISTICS SERVICES
LOCATION:
Carol Stream, IL
PROJECT COST:
$2,047,000
PROJECT DETAILS:
500,000 SF Demolition and Construction 30,000 SF Operations Center Warehouse Interior Structural Steel Modifications, Complete Warehouse Lighting Up-Grade Multi Class Hazardous Material Storage. Installation of HD Loading Dock Equipment and Up-Grades NFPA 13 Life Safety System Up-Grade. Exterior Security and Lighting.

PROJECT:
AIRCRAFT PROPELLER SERVICES
LOCATION:
Lake Zurich, IL
PROJECT COST:
$2,641,000
PROJECT DETAILS:
45,430 SF Demolition and Construction of Corporate Offices, Training and Manufacturing Facility. Custom Design and Finishes. Energy Efficient LED Lighting Up-Grades Throughout Energy Efficient HVAC Package, Design-Build MEP Package, Custom Transair Compressed Air Piping System, 2000 Amp Electrical Service-Up-Grade / Natural Gas Service Up-Grade, Exterior Pre-Cast Panel Removal and Modification, Exterior Landscaping and Lighting.







1141 E. MAIN STREET • SUITE 103, EAST DUNDEE, IL 60118
Web Design and Development By eBizUniverse
eBiz Chicago SEO Services